“Remodel of our main bathroom upstairs. “
From Bathroom Remodel and Upstairs Flooring Redo 2011, posted by Gabi Endress-Balhiser on 1/25/2011 (38 items)
- Before: Old fixtures and missing tile/wall
- Before: Old window. Tile removed to get accurate measurement for the new one.
- Before: Old tub and tile
- Before: Old tile/shower
- Before: close up of the ugly old fixtures. We used the great stuff both for insulatio…
- Before
- After Phase 1: New dimmable recessed light added over the tub (yay!). And the best pa…
- New dimmer switch and tamper resistant outlet (darn those new code regulations)
- New 2nd outlet (before we only had the one). No more fighting over who gets to use th…
- Lots of boxes of tile
- The new window, flooring (and hiding behind is the new bathtub)
- Old tile, window and drywall removed
- Uh-oh I was afraid of this … mold. Gonna need new insulation and mold scrubbing.
- New window’s in!
- There goes the old carpet!
- Sample piece of marble tile we’re putting up in the bathroom.
- Carpet’s all gone!
- New floor going in
- New tub, plumbing rough-in, and water/mold resistant drywall (yay).
- Better view of the new tub
- Better view of the wall
- Tile going on the wall!
- 1 day’s worth of progress. Putting up marble tile takes longer than ceramic tile.
- Floor laid in 1 room – I can sleep in my bed again (yay!)
- Most of the hallway is done now too.
- New storage in my room – felt right to upgrade to go with all the other changes.
- Joey approves and he missed sleeping in my bed (aww!)
- Starting to come together nicely
- A lot of the detail work started today
- 2nd wall started too
- The detail work is really looking good
- The corner shelf we picked out works really well
- Another wall started
- Crown moulding going in
- Almost done and looking gorgeous!